• Developer:  Shalimar Corp. Ltd.
  • Principal Architect: M/s Bentel Associates, South  Africa
  • Landscape Consultant: M/s Bentel Associates
  • Total Area: 8.85 Lac Sq ft built up area
  • No. of Floors: 2 Basement + Ground + 10 floors
  • Scope of PMC: Planning, Procurement, Quality  Control, MIS, Construction supervision, all aspects  of PMC
  • Cost of the Project: 200 Cr.
  • Developer:  Shalimar Corp. Ltd.
  • Principal Architect: M/s Bentel Associates, South  Africa
  • Landscape Consultant: M/s Bentel Associates
  • Total Area: 8.85 Lac Sq ft built up area
  • No. of Floors: 2 Basement + Ground + 10 floors
  • Scope of PMC: Planning, Procurement, Quality  Control, MIS, Construction supervision, all aspects  of PMC
  • Cost of the Project: 200 Cr.

Alambagh Bus Terminal project is a PPP project  which has a Bus Terminus, Four Star hotel & Mall  Lucknow, is a 8.85 lac sft built up area is  commercial development at Alambagh Lucknow,  with 2 Basement Ground Floor and 10 Floors for  Hotel Mall & Bus Terminal, parking space of more  than 2000 cars. It will be one of the best Bus  Terminal in Lucknow U.P.